Log in
Register
Menu
Log in
Register
Home
What's new
Latest activity
Authors
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Forums
Satellite TV receivers & systems support forums
Fringe Reception General
Up Coming Launch Eutelsat 21B
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="solly" data-source="post: 820151" data-attributes="member: 179410"><p>--http://www.arianespace.com/news-mission-update/2012/971.asp</p><p>October 31, 2012 – Ariane Flights VA210 & VA211</p><p>Launch vehicle preparations for the next two Ariane 5 flights from French Guiana are moving forward at the Spaceport as Arianespace maintains the mission pace in 2012 with its heavy-lift workhorse.</p><p>Activity conducted this week included installation of customer graphics on the payload fairing for Ariane Flight VA210, which is to orbit the EUTELSAT 21B and Star One C3 telecommunications satellites on a launch scheduled for November 9. </p><p></p><p>In this upward view inside the Spaceport's Launcher Integration Building, the ESC-A upper stage and vehicle equipment bay are raised as a single unit for installation atop Flight VA211's Ariane 5.</p><p></p><p>As with all Ariane 5 flights, the vehicle’s ogive-shaped payload fairing – which protects its spacecraft passengers during ascent through the denser atmospheric layers – is made available for logos and other images that represent the mission's customers and their satellites. The fairing is jettisoned approximately three minutes after an Ariane 5’s liftoff.</p><p>For Flight VA210, team members working in the Ariane 5’s Final Assembly Building placed large decals on the fairing with the Eutelsat logo and an artistic representation of EUTELSAT 21B’s coverage area, along with a red and white logo for the Star One C3 satellite.</p><p>In parallel, a key milestone was reached for Arianespace’s Flight VA211 with the completion of initial build-up for its Ariane 5, which has been assembled inside the Spaceport’s Launcher Integration Building. This step was marked with installation of the ESC-A upper stage and vehicle equipment bay as a single unit atop the vehicle’s cryogenic core stage.</p><p>Once additional integration and checkout steps are completed, the Ariane 5 will be ready for its transfer from the Launcher Integration Building to the Spaceport’s Final Assembly Building – currently occupied by Flight VA210’s Ariane 5. The Final Assembly Building will become available once the Ariane 5 for Flight VA210 is transferred from this facility to the Spaceport’s ELA-3 launch zone on the day before liftoff.</p><p>Arianespace’s Flight VA211 is targeted for mid-December with a dual-payload of the Skynet 5D and Mexsat 3 satellites.</p><p>Preparations for these two upcoming launches continue a busy year for Arianespace’s heavy-lift Ariane 5. Previous missions during 2012 lofted Europe’s third Automated Transfer Vehicle for servicing of the International Space Station on March 23; the JCSAT-13 and VINASAT-2 telecommunications spacecraft on May 15; a mixed telecommunications/meteorological satellite payload of EchoStar XVII and MSG-3 on July 5; the Intelsat 20 and HYLAS 2 relay platforms on August 2; and the ASTRA 2F and GSAT-10 spacecraft on September 28.</p></blockquote><p></p>
[QUOTE="solly, post: 820151, member: 179410"] --http://www.arianespace.com/news-mission-update/2012/971.asp October 31, 2012 – Ariane Flights VA210 & VA211 Launch vehicle preparations for the next two Ariane 5 flights from French Guiana are moving forward at the Spaceport as Arianespace maintains the mission pace in 2012 with its heavy-lift workhorse. Activity conducted this week included installation of customer graphics on the payload fairing for Ariane Flight VA210, which is to orbit the EUTELSAT 21B and Star One C3 telecommunications satellites on a launch scheduled for November 9. In this upward view inside the Spaceport's Launcher Integration Building, the ESC-A upper stage and vehicle equipment bay are raised as a single unit for installation atop Flight VA211's Ariane 5. As with all Ariane 5 flights, the vehicle’s ogive-shaped payload fairing – which protects its spacecraft passengers during ascent through the denser atmospheric layers – is made available for logos and other images that represent the mission's customers and their satellites. The fairing is jettisoned approximately three minutes after an Ariane 5’s liftoff. For Flight VA210, team members working in the Ariane 5’s Final Assembly Building placed large decals on the fairing with the Eutelsat logo and an artistic representation of EUTELSAT 21B’s coverage area, along with a red and white logo for the Star One C3 satellite. In parallel, a key milestone was reached for Arianespace’s Flight VA211 with the completion of initial build-up for its Ariane 5, which has been assembled inside the Spaceport’s Launcher Integration Building. This step was marked with installation of the ESC-A upper stage and vehicle equipment bay as a single unit atop the vehicle’s cryogenic core stage. Once additional integration and checkout steps are completed, the Ariane 5 will be ready for its transfer from the Launcher Integration Building to the Spaceport’s Final Assembly Building – currently occupied by Flight VA210’s Ariane 5. The Final Assembly Building will become available once the Ariane 5 for Flight VA210 is transferred from this facility to the Spaceport’s ELA-3 launch zone on the day before liftoff. Arianespace’s Flight VA211 is targeted for mid-December with a dual-payload of the Skynet 5D and Mexsat 3 satellites. Preparations for these two upcoming launches continue a busy year for Arianespace’s heavy-lift Ariane 5. Previous missions during 2012 lofted Europe’s third Automated Transfer Vehicle for servicing of the International Space Station on March 23; the JCSAT-13 and VINASAT-2 telecommunications spacecraft on May 15; a mixed telecommunications/meteorological satellite payload of EchoStar XVII and MSG-3 on July 5; the Intelsat 20 and HYLAS 2 relay platforms on August 2; and the ASTRA 2F and GSAT-10 spacecraft on September 28. [/QUOTE]
Insert quotes…
Verification
Post reply
Forums
Satellite TV receivers & systems support forums
Fringe Reception General
Up Coming Launch Eutelsat 21B
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.
Accept
Learn more…
Top