FIBO Projects for this year | |
![]() |
| | Thread Tools | Display Modes |
![]() | ![]() |
| | #1 | ||
| Regular Member Join Date: 27-06-2006 Location: Amsterdam
Posts: 155
Thanks: 0
Thanked 10 Times in 9 Posts
My System: Skystarcard,Fortec's life time ultra's, MaxPlus 2100's,Dreambox and a Tandberg |
This month i will start work to make some projects what we have thinking about to start. I hope some have idea's to andchanges to make it better simpler etc. 1. The Elevation for 99 Cm Fibo ( this is start and picture's are on the topic. (work on the way to connect the Acc. and a better bearring insite) 2 A clutch for the cloch the part is on transport from factory tomorro hape to show picture's of it middle or end of last week. 3 A fully controlbox with leds etc. to control the power suply to the Motorbox. AT 1 and 3. Is there some one that have a electrical diagram of a VBox? we need it for the pulse system AT 3. 2 leds for East turning (36V+) and for West turning (36V-) 1 led for control 5V and perhaps a puls counter. A switch to turn the dich by hand and for EEG a key locker. Plaese if you have idea's let know it. Thans | ||
| | |