Vipersan
Emmett Browns Ghost
- Joined
- Jun 29, 2009
- Messages
- 10,918
- Reaction score
- 6,663
- Points
- 113
- Age
- 66
- My Satellite Setup
-
IP9000HD +
TD110 Dish and TD88 Dish in Tandem
66°East to 60°West.
AZbox PrmHD + OpnbxS9HD + Skybox + DrHD F15
2x VboxII AZ-EL
2 m+ Alcoa PF + BSC421 C-Band lnbf...
+SS2/TwHnS2-3200 pci/TBS6925 pci
1.5 Fortec Star -Gbox - HtoH Ku/Ka/C
- My Location
- UK
Yep ..you are quite right ..Liking the progress so far VS! Once you're done, I want to start rebuilding mine.
I play badminton with a guy who runs an electronic engineering firm (http://www.apuljackengineering.co.uk/), so he has easy access to many parts. He said dual output (24/12v) SMPSs are quite easy to come by, so he'll check what's available. I am guessing the 12v side doesn't require a lot of current to run - 1A max for two boards should be enough?
I understand the PS you have only has a 24v output at 8.3A. Do you put that directly into the L7805CV regulator do you step it down a bit? That side runs on 5V from what I see.
12v is not needed really ..
5v is the required voltage for the electronics ..
Ideally you could step down to 12 first ...but the 7805 should be ok with a full 24v on the input which is what I'm doing ..
I remove the regulators from the pcb and mount on a seperate heatsink ..cos they will run a little hotter than freestanding as they currently are ..
but I have already tested with 24v directly on the freestanding 5v regulator for several hours ..and although it runs hotter than I'd like ...it didn't fail and didn't have me worried.
rgds
VS