gsat 14 on 19 august launch

solly

Specialist Contributor
My Location
Tel Aviv, Israel
new satellite gsat will be 3 band
ka,ku,c band
location 74 e
 

Attachments

  • d5-6.webp
    d5-6.webp
    47.9 KB · Views: 54
  • 993983_10151674595043224_895259203_n.webp
    993983_10151674595043224_895259203_n.webp
    61.3 KB · Views: 36
GSLV relaunch will take several months


Ιt would be at least two months before the Geosynchronous Satellite Launch Vehicle D5 (GSLV D5) blasts off from Sriharikota despite a dismayed Indian Space Research Organisation (ISRO) working overtime to figure out what went wrong last Monday.

“Even if the defect is found to be a minor one, it would take at least two months. The stages (GSLV is a three-stage rocket) have to be dismantled for examination. If it’s a major problem, it might take longer,’’ an ISRO source said from Sriharikota.

Another factor that will have a say in deciding the new launch date is the forthcoming north-east monsoon. The August 19 launch had to be aborted less than two hours to lift-off after a fuel leak was detected in the second stage.

http://newindianexpress.com/states/...-several-months/2013/08/23/article1747479.ece
 
A new Liquid Second Stage (GS-2) is being assembled to replace the leaked-stage. All the four Liquid Strap-on Stages are being replaced with new ones. The First Stage (Solid) and core base shroud are being inspected and the elements that are affected will be replaced. The Satellite Assembly, Avionics Equipment Bay and the Cryogenic Stage will be preserved, following prescribed practices.

Based on current availability of hardware and components, the GSLV Vehicle assembly and checkout is expected to be completed at the Vehicle Assembly Building by the first week of December 2013 and the launch could take place by December 2013.


http://www.isro.org/pressrelease/scripts/pressreleasein.aspx?Aug29_2013
 
Back
Top