Gibertini dish 1.55 Χ 1.66 ( 100.5°E -45.0°W) ku lnb Inverto Black Ultra 0.2db - Ku band Circular Uni Inverto BLACK Pro 0.2db / / C-Band lnb Titanium wide band - Pauxis 13°- K Panorama 13°K
DR.HD F-15 - Openbox S11 HD - TM-5402 HD M3 & M4
Gibertini dish 1.55 Χ 1.66 ( 100.5°E -45.0°W) ku lnb Inverto Black Ultra 0.2db - Ku band Circular Uni Inverto BLACK Pro 0.2db / / C-Band lnb Titanium wide band - Pauxis 13°- K Panorama 13°K
DR.HD F-15 - Openbox S11 HD - TM-5402 HD M3 & M4
Gibertini dish 1.55 Χ 1.66 ( 100.5°E -45.0°W) ku lnb Inverto Black Ultra 0.2db - Ku band Circular Uni Inverto BLACK Pro 0.2db / / C-Band lnb Titanium wide band - Pauxis 13°- K Panorama 13°K
DR.HD F-15 - Openbox S11 HD - TM-5402 HD M3 & M4
Ιt would be at least two months before the Geosynchronous Satellite Launch Vehicle D5 (GSLV D5) blasts off from Sriharikota despite a dismayed Indian Space Research Organisation (ISRO) working overtime to figure out what went wrong last Monday.
“Even if the defect is found to be a minor one, it would take at least two months. The stages (GSLV is a three-stage rocket) have to be dismantled for examination. If it’s a major problem, it might take longer,’’ an ISRO source said from Sriharikota.
Another factor that will have a say in deciding the new launch date is the forthcoming north-east monsoon. The August 19 launch had to be aborted less than two hours to lift-off after a fuel leak was detected in the second stage.
Gibertini dish 1.55 Χ 1.66 ( 100.5°E -45.0°W) ku lnb Inverto Black Ultra 0.2db - Ku band Circular Uni Inverto BLACK Pro 0.2db / / C-Band lnb Titanium wide band - Pauxis 13°- K Panorama 13°K
DR.HD F-15 - Openbox S11 HD - TM-5402 HD M3 & M4
A new Liquid Second Stage (GS-2) is being assembled to replace the leaked-stage. All the four Liquid Strap-on Stages are being replaced with new ones. The First Stage (Solid) and core base shroud are being inspected and the elements that are affected will be replaced. The Satellite Assembly, Avionics Equipment Bay and the Cryogenic Stage will be preserved, following prescribed practices.
Based on current availability of hardware and components, the GSLV Vehicle assembly and checkout is expected to be completed at the Vehicle Assembly Building by the first week of December 2013 and the launch could take place by December 2013.